Peru LNG
Infrastructure + project logistics
A geographic view of selected major projects executed by Urs Schaerer across FEED, transport engineering, implementation and operations. Every pin represents an actual project location—not a generic global-presence graphic.
Infrastructure + project logistics
Origin: Punta Arenas
Destination: Louisiana
Tengiz field
Kitimat facility
4.8 GW power project
Zhanjiang Verbund
Antofagasta Region
Naval architecture, extraction engineering, lifting, heavy transport, method statements and marine-risk approval.
Selected operational photography illustrates the physical interfaces behind the project atlas. Images are presented by discipline and are not attributed to a named project unless the public record has been confirmed.
The route explorer shows the real project location and the major logistics corridor or execution geography relevant to each case. Where exact transport alignments are not publicly verified, the route is explicitly labelled illustrative.
Global and local logistics supporting engineering, procurement and construction, including road interventions and bypass construction to make oversized transport feasible.
Foundation-to-foundation relocation from Cabo Negro to Geismar integrating reverse modularization, heavy haul, specialist marine transport and final positioning.
Feasibility through execution across international fabrication, inland waterways, Caspian marine transport, Prorva infrastructure and final heavy haul to Tengiz.
Execution planning, modelling, transport concepts, simulation, engineering support and critical-risk review during front-end development.
Transport concept, heavy-lift terminal, inland routes, specialist cranes, SPMTs and execution support for major power-generation equipment.
International and China project logistics connecting fabrication and suppliers with local execution and the Zhanjiang project environment.
Multi-origin supply, domestic transport, heavy and oversized movements, mine-site compliance and high-volume execution in northern Chile.
Naval architecture, extraction engineering, lifting, heavy transport and method-statement development through marine-risk review and approval. Exact public map location remains pending project-record verification.